The men from Grace worked at church and camp today.  General Spring maintenance was performed such as the following  
Church
- Replaced the rotten wood trim around the office door.
- Cleaned out the flowerbeds in front of the church and trimmed the bushes.
- Installed the baseboard trim in the Girl's Dorm bathroom for Camp Liberty.
Camp
- Re-graded the Hunt's walkway so that rainwater from the Camp Liberty roof won't create a pond by their front door every time it rains.
- Finished installing the roof on the storage trailer to stop leaks and protect the equipment it holds.